Precise heating and cooling load calculations for informed investment decisions

Dynamic building simulations

Precise heating and cooling load calculations for informed investment decisions

We use our 3D model to simulate the actual energy performance of your buildings. This provides a reliable basis for correctly dimensioning systems, reducing operating costs, and better planning renovation measures.

Precise heating and cooling load calculations for informed investment decisions

Scope of service

Dynamic simulation

Dynamic simulation

Simulation of heating or cooling requirements in accordance with SIA 380/2

Eegulatory strategies

Eegulatory strategies

Analysis of different control strategies and usage profiles

Scenario comparisons

Scenario comparisons

Renovation measures and climate change can be taken into account

Room-by-room evaluation

Room-by-room evaluation

Detailed simulation results per room zone

Why this is important

Dynamic building simulations prevent bad investments, highlight potential savings, and increase planning reliability. Owners and planners receive an objective basis for decision-making based on precise 3D data.

Your benefits

Ensure efficiency

Realistic simulations prevent oversized systems and unnecessary investments.

Reduce operating costs

Optimized systems reduce energy consumption and maintenance costs and extend the service life of your equipment.

Fast return on investment

Savings from optimized dimensioning and lower operating costs often exceed the analysis costs in the first year.

Gain planning reliability

Comparisons under different climate conditions and usage scenarios enable reliable decisions to be made.ermöglichen verlässliche Entscheidungen.

Creating transparency

All results are presented in a clear and comprehensible manner and can be accessed directly in NORM Explorer.

Practical examples

Efficient renovation of an office building in Zurich

Efficient renovation of an office building in Zurich

During the renovation of an office building in Zurich, a detailed simulation enabled the heating load to be reduced from 460 kW to 360 kW. The analysis made it possible to use a smaller heat pump and significantly lower investment costs.

Initial situation

Heating load 460 kW

Simulation with NORM 3D model

Actual demand 360 kW

Result

Smaller heat pump → Investment costs reduced by CHF 40,000, same level of comfort
Optimized connection power for a logistics center

Optimized connection power for a logistics center

A dynamic simulation showed that the originally estimated heating capacity of the logistics center was significantly too high. Thanks to the precise determination of requirements, the connected load could be reduced considerably.

Initial situation

District heating connection planned with 510 kW (existing value of the old system)

Simulation with NORM 3D model

Actual demand: 300 kW

Result

Reduced connected load → annual connection fees reduced by over CHF 20,000, same level of comfort & secure supply